Bookcover of Time & Cost Overrun Analysis of Highway Projects
Booktitle:

Time & Cost Overrun Analysis of Highway Projects

LAP LAMBERT Academic Publishing (2015-07-17 )

Books loader

Omni badge eligible for voucher
ISBN-13:

978-3-659-75192-9

ISBN-10:
3659751928
EAN:
9783659751929
Book language:
English
Blurb/Shorttext:
The study presents an insight into the present scenario on Indian highways including cross continental comparison with the neighbouring China as well as developed nations such as USA and Europe. The poor quality of road infrastructure coupled with heavy congestion on important national highways has led to initiation of National Highway Development Project (NHDP) was discussed in detail in the sub section background of study. The wide prevalence of delays in the implementation of highway projects under NHDP has necessitated the present study on time and cost overruns. Regression analysis was carried out on the ongoing highway projects using SPSS computer program and mathematical equations were derived between various project parameters to portray the behavior of time and cost overruns. Delay Index model incorporating the various causes of delay was evolved for estimation of time overruns and for predicting the future outcomes. Certain innovative suggestions such as beneficiary participation and auctioning of highway projects were aired for the sound implementation of NHDP. Strategies for future implementation such as project packaging, appropriate mix of BOT were also deliberated.
Publishing house:
LAP LAMBERT Academic Publishing
Website:
https://www.lap-publishing.com/
By (author) :
Kishore Kumar Makam, Chappidi Hanumantha Rao
Number of pages:
296
Published at:
2015-07-17
Stock:
Available
Category:
Management
Price:
82.90 €
Keywords:
India, World Bank, national highway development project, capacity constraints, utility shifting, Cost overruns, land Acquisition, project delays

Books loader

Newsletter

Adyen::diners Adyen::jcb Adyen::discover Adyen::amex Adyen::mc Adyen::visa Adyen::cup Adyen::alipay Adyen::unionpay Adyen::paypal Paypal CryptoWallet Wire Transfer

  0 products in the shopping cart
Edit cart
Loading frontend
LOADING